Project Rendering | Laguna Canyon Channel Replacement Project

OC Public Works presented the Project to the City of Laguna Beach Planning Commission on May 18, 2022. The Commission approved the Design Review and Coastal Development Permit which authorizes OC Public Works to construct the Project within City jurisdiction. On June 7, 2022, the Board of Supervisors approved the Construction Contract to Ames Construction. Project construction is anticipated to start Fall 2022 as a result of the City’s construction moratorium during the 2022 Sawdust Art Festival.

Background

Laguna Canyon Channel Replacement Project | 2019 Storm Channel Wall Failure

During heavy storms in February 2019, approximately 265 feet of the channel wall closest to Laguna Canyon Road collapsed. An investigation determined that an emergency repair was needed to maintain flood protection to the community. In March 2019, a temporary repair was implemented to fix the collapsed wall and bracing was added to prevent additional failures. The project will replace the temporary repairs with a permanent solution for the channel.

 

Project Scope

The Laguna Canyon Channel Replacement Project, between Laguna Canyon Frontage Road and Woodland Drive, consists of removing and replacing the rectangular concrete channel, reconfiguring small concrete pedestrian crossings, removing and replacing softscape and hardscape that may be damaged or removed in order to construct the Project, and removing trees within the Project limits that pose a risk to the channel.

 

Location

Click on image below to download PDF.

Laguna Canyon Channel Replacement Project Map

Status

Pre-Construction


Meetings

Orange County Board of Supervisors (Award the Construction Phase Services Contract)

Tue. June 7, at 9:30 a.m.

picture_as_pdfAgenda 06.07.22
smart_display Board Meeting Recording 06.07.22


City of Laguna Beach Planning Commission (Design Review 22-0735 and Coastal Development Permit 22-0736)

Wed., May 18, 2022 at 6 p.m.

picture_as_pdfAgenda /Documents 05.18.22
smart_display Recap 05.18.22
smart_display City of Laguna Beach Live Stream Recording 05.18.22


City of Laguna Beach Planning Commission (OCPW Presentation)

Wed., August 4, 2021 at 6 p.m.
picture_as_pdf Event Flyer 08.04.21
smart_display Recap
smart_display City of Laguna Beach Live Stream Recording 08.04.21


Orange County Board of Supervisors (Award Design Phase Services Contract)

Tue., March 23, 2021 at 9:30 a.m.

picture_as_pdfMinutes 03.23.21
smart_display Board Meeting Recording 03.23.21


Project Contact

Austin Morgan, P.E. 
phone (714) 647-3981  